欢迎各行业项目工程师应聘,英语口语为必须项
"1.负责系统工程部重要、3星及以上客户订单、风阀及研发项目订单的推进,协调项目过程中的难点,推动各部门之间的合作解决完成时间
Be responsible for the promotion of important, 3 star & above customer orders, damper valve orders, R&D projects of system engineering department by coordinating, identifying and reporting difficulties in the process between various departments to solve the obstacles and to achieve on time delivery."
"2. 贯彻并严格遵守系统工程部预先安排的工作流程,做好汇总报告,提前控制风险,解决问题。
Implement and strictly adhere to the prearranged working process of system engineering department, make consolidated reports to control risks and solve the problems beforehand."
"3.负责参与新订单审核,了解订单规格,准备并维护指定的文件夹和所有订单文件。
Be responsible for participation in new order reviews, accept the order specifications, prepare and maintain specified folders with all documentations of orders."
"4. 负责编制项目进度计划,物料计划,工艺和装配时间计划,安排订单的检验和交货日期提前通知客户。
Be responsible for preparing construction schedules, material planning, process and assembly time scheduling, arranging advanced notification to customers about inspections and delivery dates of the order."
"5. 负责进行内部FAT,确保产品在客户检验前按客户订单要求准备好。并负责接待和协调第三方检验员(SBM订单),顺利完成检验和订单放行通知单。
Be responsible for conducting internal FAT to ensure the products are ready as per the customer order requirements before customer inspection. And responsible for rec
"1.负责系统工程部重要、3星及以上客户订单、风阀及研发项目订单的推进,协调项目过程中的难点,推动各部门之间的合作解决完成时间
Be responsible for the promotion of important, 3 star & above customer orders, damper valve orders, R&D projects of system engineering department by coordinating, identifying and reporting difficulties in the process between various departments to solve the obstacles and to achieve on time delivery."
"2. 贯彻并严格遵守系统工程部预先安排的工作流程,做好汇总报告,提前控制风险,解决问题。
Implement and strictly adhere to the prearranged working process of system engineering department, make consolidated reports to control risks and solve the problems beforehand."
"3.负责参与新订单审核,了解订单规格,准备并维护指定的文件夹和所有订单文件。
Be responsible for participation in new order reviews, accept the order specifications, prepare and maintain specified folders with all documentations of orders."
"4. 负责编制项目进度计划,物料计划,工艺和装配时间计划,安排订单的检验和交货日期提前通知客户。
Be responsible for preparing construction schedules, material planning, process and assembly time scheduling, arranging advanced notification to customers about inspections and delivery dates of the order."
"5. 负责进行内部FAT,确保产品在客户检验前按客户订单要求准备好。并负责接待和协调第三方检验员(SBM订单),顺利完成检验和订单放行通知单。
Be responsible for conducting internal FAT to ensure the products are ready as per the customer order requirements before customer inspection. And responsible for rec
职位类别: 项目经理/主管
举报温馨提示
- 你可能感兴趣的职位
- 最近浏览记录
-
15-20W/年
-
15-40W/年
-
15-20K/月
-
20-30W/年
-
20-25W/年
-
10-14.9K/月
-
25-35W/年
-
8-12K/月
-
面议
-
面议
-
面议
-
5-6K/月
-
面议





